by Piping Engineer
March 17, 2009
Checklist
Following items taken into account 1. Standard Specification -The source of the standard specification has been identified & agreed with Client. -Where standard specification is to be modified, addendum has been generated, reviewed & approved. 2. New Specification -Format reviewed, Scope identified. -Code, Standards, References listed. -Design & Technical references identified. -Material requirements identified. -Fabrication [...]
Read More–>>
by Piping Engineer
March 17, 2009
Checklist
DRAWING CHECK Are the following aspect correct: -Title -Drawing and sheet number -Drawing format -North arrow -Revision number and reason for issue -Scale -Presence of all required signatures -Key Plan -Reference drawings ( Plot Plans, GA’s, etc…) -Matchline shown with continuation drawing numbers -Steel grid reference -Equipment shown to the correct size and location -Pipe [...]
Read More–>>