Following items taken into account 1. Standard Specification -The source of the standard specification has been identified & agreed with Client. -Where standard specification is to be modified, addendum has been generated, reviewed & approved. 2. New Specification -Format reviewed, Scope identified. -Code, Standards, References listed. -Design & Technical references identified. -Material requirements identified. -Fabrication [...]
TECHNICAL REPORTS Check List
The following shall be considered in TECHNICAL REPORTS 1.Document Format -Verify document cover sheet and headers have correct document number, document name, and revision per project document register. -Verify format conforms to the most recent revision of Company internal standards for formatting & content. -Verify correct contents formatting and numbering (including logos, company names and [...]
Bentley AutoPIPE and STAAD.Pro
UK company delays oil projects in Vietnam
Soco International Plc of the UK announced that it will delay its oil exploitation plan at Te Giac Trang (White Rhino) field until mid 2011, one year behind schedule. The Financial Times on March 10 quoted Ed Story, Soco’s president and CEO, saying his company has also decided to cancel its plan for exploration at [...]
Check list for Tie-in Schedule and Drawings
Check list for Tie-in Schedule and Drawings DRAWING CHECK Are the following aspects correct -Title -Drawing and sheet number -Drawing format -North arrow -Revision number and reason for issue -Presence of all required signatures -Reference drawings ( GA’s, ISO, P&ID, etc…..) -Adequate space available for Hot taps, for installation of Hot tap machine -Tie-in drawing [...]
DESIGN BASIS Check List
The following shall be considered in DESIGN BASIS -Approved Scope of Work is provided.-The Scope of Work has been reviewed by PM, PjE and LE.-The Client has provided Design Basis document(s).-The Client has provided Standards Specifications-The Client has provided Data Sheets.-The Client has provided Drawings.-The Client has provided a list of applicable industry standards.-Regulatory requirements [...]
ProEngineer Piping Fittings in Wildfire 3.0
How oil refining works
Oil is pumped from deep underground and under seas. Once it has been collected, it is transported to a refinery where it is turned into useful products for customers. A barrel of crude oil is 42-gallons. From this, regulations force refineries to turn at least 50 percent into gasoline. Crude oil from each reservoir has [...]
LPG storage and tank truck station built in Dung Quat
Nhan Dan Online/VNA – Work started for the construction of a LPG storage and tank truck station in the Dung Quat economic zone’s Eastern Industrial Zone on March 16 with a total initial investment of 226.6 billion VND. The Vietnam Gas Corporation, a subsidiary of the Vietnam Oil and Gas Group (PetroVietnam), is the investor [...]