Check list for Specification

Following items taken into account 1. Standard Specification -The source of the standard specification has been identified & agreed with Client. -Where standard specification is to be modified, addendum has been generated, reviewed & approved. 2. New Specification -Format reviewed, Scope identified. -Code, Standards, References listed. -Design & Technical references identified. -Material requirements identified. -Fabrication [...]

Check list for General Arrangement Drawings

DRAWING CHECK Are the following aspect correct: -Title -Drawing and sheet number -Drawing format -North arrow -Revision number and reason for issue -Scale -Presence of all required signatures -Key Plan -Reference drawings ( Plot Plans, GA’s, etc…) -Matchline shown with continuation drawing numbers -Steel grid reference -Equipment shown to the correct size and location -Pipe [...]

TECHNICAL REPORTS Check List

The following shall be considered in TECHNICAL REPORTS 1.Document Format -Verify document cover sheet and headers have correct document number, document name, and revision per project document register. -Verify format conforms to the most recent revision of Company internal standards for formatting & content. -Verify correct contents formatting and numbering (including logos, company names and [...]

Check list for Tie-in Schedule and Drawings

Check list for Tie-in Schedule and Drawings DRAWING CHECK Are the following aspects correct -Title -Drawing and sheet number -Drawing format -North arrow -Revision number and reason for issue -Presence of all required signatures -Reference drawings ( GA’s, ISO, P&ID, etc…..) -Adequate space available for Hot taps, for installation of Hot tap machine -Tie-in drawing [...]

DESIGN BASIS Check List

The following shall be considered in DESIGN BASIS -Approved Scope of Work is provided.-The Scope of Work has been reviewed by PM, PjE and LE.-The Client has provided Design Basis document(s).-The Client has provided Standards Specifications-The Client has provided Data Sheets.-The Client has provided Drawings.-The Client has provided a list of applicable industry standards.-Regulatory requirements [...]

Check list for General Drawing

Following items taken into account -Verify that the drawing information is sufficient for the issue purpose. -Verify that the drawing drafting check has been performed i.e. checklist has been completed and signed off -Verify that drawing information meets required regulatory and classification codes, rules, and regulations. -Verify drawing meets contract requirements. -Verify concurrence with design [...]

Check list for Piping Stress Analysis

DRAWING CHECK Are the following aspect correct: 1. INPUT DATA a. Conformance with Isometrics -Pipe Diameter -Piping Class ( including Class breaks ) -Dimensions -Support Locations -Rigid Weights -Major connecting lines considered b. Conformance with Line List -Line Number -Piping Class and Material of Construction -Design Temperature -Design Pressure -Test medium / pressure c. Conformance [...]

Check list for General Arrangement Drawings

DRAWING CHECK Are the following aspect correct: -Title -Drawing and sheet number -Drawing format -North arrow -Revision number and reason for issue -Scale -Presence of all required signatures -Key Plan -Reference drawings ( Plot Plans, GA’s, etc…) -Matchline shown with continuation drawing numbers -Steel grid reference -Equipment shown to the correct size and location -Pipe [...]

Check list for Plot Plans

DRAWING CHECK Are the following aspect correct: 1. Title 2. Drawing and sheet number 3. Drawing format 4. North arrow ( Plant/ True ) 5. Revision number and reason for issue 6. Scale 7. Presence of all required signatures 8. Key Plan 9. Reference drawings ( P&ID, GA’s, etc…) 10.Sections correctly cross-referenced to plans 11.Steel [...]

Check list for Isometric Drawings

DRAWING CHECK Are the following aspect correct: 1. Title 2. Drawing and sheet number 3. Drawing format 4. North arrow 5. Revision number and reason for issue 6. Presence of all required signatures 7. Reference drawings ( P&ID’s, GA’s, etc…) 8. Following information completed -Heat tracing and insulation requirements -Inspection requirements -Design conditions -Test pressure [...]