DRAWING CHECK
Are the following aspect correct:
1. Title
2. Drawing and sheet number
3. Drawing format
4. North arrow ( Plant/ True )
5. Revision number and reason for issue
6. Scale
7. Presence of all required signatures
8. Key Plan
9. Reference drawings ( P&ID, GA’s, etc…)
10.Sections correctly cross-referenced to plans
11.Steel grid references
12.Levels Designation (Cellar Deck, Lower Deck, etc…..)
13.Equipment Identification and Schedule (Tag No., Designation & sizes)
14.Equipment shown to the correct size
15.Battery Limits and Boundaries
16.COMPANY comments investigated and included where agreed
17.Comments from “Master” drawing included
18.Completion of “Hold” list
19.IDC Comments investigated & incorporated when agreed
20.Tank farm, Process area, Utility area, Buildings, Platforms, Equipment, Piperacks and Roads shown to the correct location and orientation based on the following operating safety and maintenance considerations/factors
-Process and Economic Piping
-Access to and clearance around Equipment/ Buildings
-Client specifications, standards and requirements
-Plant bench marks and grade
-Access from adjacent units ( Existing / New )
-Distance from existing facilities
-Noise Pollution
-Minimum safety inter-unit spacing requirements
-Drainage and Grade sloping
-Escape routes (Headroom and clearance)
-Access for fire fighting
-Fire and Explosion protection
-Limits of Plating/Grating
-Prevailing wind direction
-Exclusion zones/Hazardous areas
-Laydown and Dismantling areas
-Loading and Unloading areas
-Hatches
-Lifting Equipment
-Emergency shutdown valves location