Dung Quat Oil Refinery begins operations

On February 9th, the Dung Quat Refinery in the Central Province of Quang Ngai officially began became operational. The crude oil distillation tower in the CDU atmospheric pressure unit, one of the most important units of the Dung Quat refinery, has started refining around 900,000 tons of crude oil, reaching 60 percent of its total [...]

Free Engineering Software Download

Here is link  Download Free Software from our partner/network site. You can find many free software there.Don’t forget to subcribe in order to get password for Protected Area. Cheer and enjoy

Petrovietnam plans $250-mln oil depot for refinery

The trading arm of Vietnam’s state oil firm Petrovietnam will build a $250 million oil depot by 2010 to store products from the country’s first refinery Dung Quat, a state-run newspaper reported on Monday. PV Oil, which operates about 2,000 filling stations nationwide, will also distribute products from the 140,000-bpd refinery due to start operating [...]

Vietnam Cuts Offer for April-September Bach Ho Oil Exports

PV Oil Co., Vietnam’s state-owned oil marketing company, cut its offer price for Bach Ho crude loading from April to September after buyers rejected the initial level, said traders who received the offer. PV Oil Co. reduced its offer to a premium of $5.03 a barrel over its benchmark from $5.16 a barrel, said two [...]

Free Autocad Symbol and Piping Data

piping-parts-minimum-assembly-dimension

Free download. This is for members only. You can download for free by type your name and email address Screen shot (Autocad symbol for piping was not shown)

Check list for General Drawing

Following items taken into account -Verify that the drawing information is sufficient for the issue purpose. -Verify that the drawing drafting check has been performed i.e. checklist has been completed and signed off -Verify that drawing information meets required regulatory and classification codes, rules, and regulations. -Verify drawing meets contract requirements. -Verify concurrence with design [...]

Check list for Piping Stress Analysis

DRAWING CHECK Are the following aspect correct: 1. INPUT DATA a. Conformance with Isometrics -Pipe Diameter -Piping Class ( including Class breaks ) -Dimensions -Support Locations -Rigid Weights -Major connecting lines considered b. Conformance with Line List -Line Number -Piping Class and Material of Construction -Design Temperature -Design Pressure -Test medium / pressure c. Conformance [...]

Check list for General Arrangement Drawings

DRAWING CHECK Are the following aspect correct: -Title -Drawing and sheet number -Drawing format -North arrow -Revision number and reason for issue -Scale -Presence of all required signatures -Key Plan -Reference drawings ( Plot Plans, GA’s, etc…) -Matchline shown with continuation drawing numbers -Steel grid reference -Equipment shown to the correct size and location -Pipe [...]

Check list for Plot Plans

DRAWING CHECK Are the following aspect correct: 1. Title 2. Drawing and sheet number 3. Drawing format 4. North arrow ( Plant/ True ) 5. Revision number and reason for issue 6. Scale 7. Presence of all required signatures 8. Key Plan 9. Reference drawings ( P&ID, GA’s, etc…) 10.Sections correctly cross-referenced to plans 11.Steel [...]

Check list for Isometric Drawings

DRAWING CHECK Are the following aspect correct: 1. Title 2. Drawing and sheet number 3. Drawing format 4. North arrow 5. Revision number and reason for issue 6. Presence of all required signatures 7. Reference drawings ( P&ID’s, GA’s, etc…) 8. Following information completed -Heat tracing and insulation requirements -Inspection requirements -Design conditions -Test pressure [...]