Piping BM and BQ estimation

by Piping Engineer on December 18, 2008

Piping BM and BQ estimation

1.What is Piping Bill of Materials (BM)?

-Is the total list of material that will be used for procurement purposes
-The list consist of the following items:

a.Piping Bulk Materials (pipes, fittings, etc.)
b.Special Piping Materials (strainer, expansion joints, etc.)

2.What is Piping Bill of Quantity (BQ)?

-Is the total list of piping material and inch-diameter (ID) that will be used for piping construction purposes.
-It pertains to the data that indicates the volume of piping construction work

Note:  Inch-diameter (ID) is equal to pipe nominal size x number of welding area