Study of piping lay out around the Heater

by Piping Engineer on December 21, 2008

Study of piping lay out around the Heater

The piping around heaters are consist of the following:

1. Types of Heaters

a.Typical Heater Types

-Vertical, Cylindrical Type
-Cabin Type (Horizontal Tube Arrangement)
-Box Type (Vertical Tube Arrangement)

b. Typical Burner Types and Arrangements

-Gas Burner
-Oil Burner
-Oil-Gas Burner

Generally, burners are located on the floor and on the side wall (end or side burner).

2. Layout

-Since heaters will handle flames, a sufficient safe distance must be provided between each heater and equipment designed to handle flammable fluids
-The collocation of heaters and related equipment (to which the heater outlet piping is to be connected) shall be determined after measures against thermal stress and vibration are reviewed
-As heaters play a major role in their process units and their accident may directly lead to plant shut-down in many cases, it is desired that they would be located in areas where their operation can be monitored at all times
-Space for the maintenance of the heating tubes shall be provided

3. Structure Planning

-Check the dimensions, locations and elevations of the platforms. Make necessary additions, if any
-Check the types and locations of ladders and stairways and make additions if necessary
-Determine the pipe supports which can be designed better as a part of the heater structure than as a part of the piping

4. Piping Plan

1. Process Piping

-Heater Inlet Piping
-Heater Outlet Piping

2. Utility Piping

a. Fuel Piping

-Fuel Oil Supply Piping
-Fuel Oil Return Piping
-Fuel Gas Piping
-Pilot Gas Piping
-Atomizing Steam Piping

b. Snuffing Steam Piping
c. Decoking Piping
d. Soot blower Piping
e. Steam Generation Piping

-Heater Inlet Piping
-Heater Outlet Piping

5. Design Work Flow

-Advance Check
-Preparation of General Piping Arrangement
-Preparation of detailed Piping Arrangement
-Preparation of Auxiliary Piping Arrangement

a. STEP 1

-Checking the required documents
-Understanding the contents of basic documents
-Checking of Heater itself and relevant items

b. STEP 2

-Preparation of conceptual routing drawing
-Studying for the necessity of operation platform and pipe support
-Studying of basic piping plan

c. STEP 3

-Preparation of Process Piping Arrangement
-Preparation of Utility Piping Arrangement
-Preparation of Decoking Piping Arrangement
-Support Plan